Account Information Form
document center
| Pages | 1 |
|---|---|
| File Size | 0.1 MB |
| Folder | Departments/Utilities |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
ACCT # **BALANCE** GOOD TO: VERIFY 1 VERIFY 2 Property Type $ Quarterly Facility Charge SEWER USE Town Owned Grinder Pump OTHER CHARGES Secondary Meter NOTES: If there is a sewer deduct meter, the deductions will end with the seller; the new owner can continue if an application is filled out at our office. (1) Name of Person and Company requesting information: It is important to note that we bill in arrears. Therefore, a final water meter reading from the City of New London is required to calculate the final bill. Contact New London Veolia Water at 860-447-5222 to schedule a final water meter reading. (5) Property Location: (8) Name of Prospective Owners (6) Today's Date: (2) Phone Number : (4) Email Address: When Property sells, this grinder pump becomes the responsibility of the new owner **IMPORTANT**PLEASE ALLOW 48 HOURS FOR INFORMATION TO BE COMPLETED AND EMAILED BACK TO YOU** INSTRUCTIONS: Please fill in the information for items 1 through 8 and email to wuc@waterfordct.org WATERFORD UTILITY COMMISSION ACCOUNT INFORMATION FORM We are happy to help with calculations!! Please submit to us the final New London water bill and we will send you a completed worksheet of the final sewer cost owed by the seller. ** This is not the final amount owed by the seller - just the amount owed as of the last water meter read date which was _____/_____/_____ ** The Utility Commission bills quarterly. (7) Current Owner: (3) Date of Closing: