Pools and Spas (PDF)
document center
| Pages | 2 |
|---|---|
| File Size | 0.2 MB |
| Folder | Departments/Building/Permit Application Requirements |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
Pools and Spas Minimum Permit Application Requirements Note: Please keep in mind that a complete application with all required information will help expedite the application process. The following information is provided to assist in preparing a complete application package but in no way guarantees application approval or compliance with all applicable code requirements. It is the responsibility of the applicant to provide a complete and code compliant building permit application with supporting documentation. General Requirements ___Completed building permit application form (available in permitting office) ___Submission of two sets of all drawings and information is required. One set will be returned with comments and/or conditions of approval and is to be left at the job site during construction. ___Zoning approval is required prior to issuance of the building permit. ___Building permit application(s) will not be accepted if taxes or utility commission fees are owed on the property. ___If the applicant is not the homeowner, a “Letter of Authorization” from the homeowner shall be submitted with the application. ___A certificate of insurance for workers’ compensation coverage must be provided by contractors or a sworn notarized affidavit provided, stating that the homeowner / agent will require proof of workers’ compensation insurance for all those employed on the job site. ___All contractors that perform pool maintenance or repair work must have a SP-1 license issued by DCP. ___Electrical, Plumbing and other trades are required to be licensed in Connecticut. A copy of their license and proof of insurance will be required at the time of application for a permit. Minimum Plan Requirements ___ Plans shall be drawn to scale (1/4” per ft. preferred) and shall include the following: Site plan(s) 1”=20’ Pool plan and details Dimensions, specifications and details as required to convey the scope of work. ___ Plans shall show all retaining walls, decks, porches, overhangs, stairs or other similar features along with all construction details, dimensions and material call-outs. Retaining walls may require engineered plans. ___ Plans shall show the proposed pool barrier, access gates and details if pool is in-ground. Special Requirements ___ If the existing property is serviced by a private septic system and/or a private well, the plans will need to be reviewed by Ledge Light Health District. The plans will be forwarded to Ledge Light by this office prior to building department review. 8/8/2012 Other Requirements ___ Contractor / Owner shall keep one set of the approved plans readily available on the job site at all times during the construction. ___A separate electrical permit will need to be secured for this project. ___The pool pump must be provided with a time clock so the pump can run during off-peak hours for energy conservation. ___A GFIC receptacle in addition to the dedicated pump receptacle shall be provided between 10’ and 20’ of the pool edge. ___If any decks or stairs are proposed around the pool, separate plans will need to be submitted for review and approval. ___Installation shall be in strict accordance with all manufacturers’ installation requirements, building codes and the “Pool Installation Guide” that you can receive from this office. Should there be any conflict in requirements, please consult this office for clarification. ___The owner / contractor is responsible for contacting this office for the required inspections including the final inspection. A schedule of inspections form can be obtained in the permitting office. ___ A cost estimate as described in the Permit Fees page shall be provided.