WATERFORD UTILITY COMMISSION
DATE:
February 13, 2024
PLACE:
1000 Hartford Turnpike / Zoom
PRESIDING:
Chairman Ken Kirkman
MEMBERS PRESENT:
Tom Dembek, Steve Negri and Ray Valentini
MEMBERS ABSENT:
Rodney Pinkham
ALSO PRESENT:
J. Robert Tuneski, Finance Liaison
Attorney Nicholas Kepple, Town Legal Counsel
Staff: James A. Bartelli, Director of Utilities
Jill Stevens, Assistant Director of Utilities
Chairman Ken Kirkman called the meeting to order at 6:07 p.m.
CITIZEN SESSION-None
SECRETARY’S REPORT
MOTION
Made by Mr. Dembek to approve the Minutes of the January 9th meeting, Mr.
Negri seconded.
VOTE
The motion passed unanimously.
BILLING ADJUSTMENTS
The Commission reviewed the January adjustments. There were some questions on some of the
higher dollar amount adjustments that Miss Windle explained. The adjustment report will be
kept in the office for review.
EXPENDITURES
MOTION
Made by Mr. Negri approve the January 2024 bill list, Mr. Dembek seconded.
VOTE
The motion passed unanimously.
Waterford Utility Commission
February 13, 2024
2 | P a g e
OLD BUSINESS
•
Director’s Report
Mr. Bartelli reviewed his report that provides updated information on all Utility
Commission Capital projects that are currently funded and the status of each project.
A copy of the Director’s Report will be attached to the minutes when posted.
•
Collection’s Report
Attorney Kepple gave a short report that collections were going well.
•
Ad-Hoc Water Committee
Mr. Bartelli reported that he is seeking a recommendations for a member to this Task
Force.
New Business
•
Fargo Water Tank
Mr. Bartelli explained the need for a change order on the Fargo Water tank
rehabilitation project. There is a small leak in the fill pipe that needs to be replaced.
MOTION
Made by Mr. Negri to utilize the Water fund to cover the cost above the
currently appropriated ARPA funds for the new fill pipe on the
Fargo water tank, seconded by Mr. Dembek.
VOTE
The motion passed unanimously.
Water
City of New London/Veolia Report.
The monthly report was provided to the Commission to review.
Mr. Bartelli reported that the regular meeting with New London have been beneficial and updated on
different projects going on.
PLANS REVIEW
None
PERSONNEL
Please see the Director’s Report for an update.
OTHER
Waterford Utility Commission
February 13, 2024
3 | P a g e
ADJOURNMENT
With no further business before the Commission, the meeting adjourned at 7:20 p.m.
MOTION
Made by Mr. Negri to adjourn, Mr. Dembek seconded.
VOTE
The motion passed unanimously.
Respectfully submitted,
Amy L. Windle
Recording Secretary
P a g e | 1
Waterford Utility Commission
Director’s Report
February 13, 2024
This report summarizes the Commission’s ongoing projects and operational activities
Current Capital and Capital Non-Recurring Funded Projects
1. Inflow and Infiltration Mitigation and Control
FY 19 Capital & Non-Recurring Expenditure Fund L.I. #20531-57685
Original Appropriation: $388,303.00 : Available Balance: $283,485.86
The current study is the Richards Grove Road Wastewater Pumping Station Basin I&I evaluation
being conducted by Wright-Pierce Engineers for the amount of $27,500.00 This project consist of
conducting additional inflow and infiltration I&I evaluation and Sewer System Evaluation Study
(SSES) for the Richards Grove drainage area. This drainage area has been identified as one of the
larger contributors of I&I to our Collection System. This area possesses approximately 5
miles of 8-inch diameter gravity sewer piping and serves primarily residential users. The current
flows received and conveyed by the Richards Grove Pump Station are greater than the current
capacity of the pump station, triggering the potential need for a capacity upgrade if the I & I
sources cannot be identified and mitigated. Flow monitoring and metering will commence in the
spring. The I&I mitigation and control program is an ongoing project. Our staff routinely conducts
pipeline and manhole assessments with the use of our CCTV and Jet Rodding apparatus. Deficiencies
are located, graded and catalogued based upon severity. Corrective repairs are typically conducted
during springtime utilizing robotic trenchless technology. Sewer Contracts #2&3 cross country sewer
manhole raisers were evaluated this past month, 22 manhole cone tops require replacement. A site
meeting with our on-call contractor is scheduled for 2/15/24 to review the scope.
P a g e | 2
2. Old Norwich Road Wastewater Pump Station Rehabilitation
There are two CNR designations totaling $1,299,369 in LI # 20531-57816. In addition, available
ARPA funds in the amount of $1,020,041. Total available funds are $2,319,410 .Competitive bid
results for this project were received on August 10, 2023. The lowest bid received was from Holzner
Construction in the amount of $2,113,850.00 The Notice to Proceed for Holzner was executed on
January 16, 2024. A Contract Administration proposal from Wright- Pierce was executed 1/19/2024 in
the amount of $55,800.00 The contractor has represented that there are long lead times for electrical
switch gear, up to 56 weeks.
3. Control Panel Retrofit
FY22 Capital Improvement Fund L.I. 33122-55894
Original Appropriation: $30,000.00 : Available Budget: $30,000.00
This project entails replacing the existing pump control panels, which are obsolete and
unsupported with current control technology. This work will ensue upon completion of
upgrades currently being conducted at 10 of the lift stations, which are identified within this
report and are being funded with ARPA funds.
4. Pump Station Exterior Improvements
FY22&23 Capital Improvement Fund L.I. # 33123-55895
Original Appropriations: $ 100,000.00 (50K ea. L.I.) : Available Budget: $44,790.34
To date under these two L.I.#s, roof replacements have occurred at Shore Road, Dock Road,
Bolles Ct, Waterford Village, Sea Side, Niantic River Rd and Mago Pt, and the exterior siding was
replaced at the Waterford Village and Bolles Ct stations. In addition, siding repairs were
conducted at Stoney Brook Station. This program will reconvene in the spring of 2025
5. Fargo Water Tank Rehabilitation.
This is an ARPA allocation project in the amount of $1,200,000.00.
An on-site pre-bid meeting was conducted on May 17, 2023
Bids were received May 31, 2023 which ranged from $999,900 to $2,214,000.00 The Utility
Commission accepted the recommendation from Haley Ward Engineering dated June 23, 2023
recommendation the Fargo Water Tank refurbishment project be awarded to Utility Service
Company for the bid price of $990,900.00 and forward to the Board of Selectman for award.
The Board of Selectman acted to accept the recommendation on July 11, 2023. An award letter
has been sent to the contractor. The tank contractor, USG Water, is now planning to start work
P a g e | 3
spring of 2024. A Pre-Construction meeting was conducted on November 27th.The pinhole leak
at the base of the fill pipe which recently presented itself was discussed. This issue was not
present during the Tank Evaluation study nor was the standpipe interior evaluated during the
study, as there are no means to inspect the interior of the standpipe. Alternatives to correct
this deficiency were evaluated by our consulting engineer and the contractor; a change order
proposal in the amount of $217,857.00 was submitted and is under evaluation. On February 1,
2024 we met with a different Tank Contractor to investigate the fill pipe and are awaiting their
estimate.
6. Gorman-Rupp Pump Station Controls
This is an ARPA allocation project in the amount of $163,750.00.
To date Dock Road, Richards Grove Road, Old Barry Road, Quaker Hill Center, Oil Mill,
Oswegatchie Rd and Niantic River Road stations are complete. Works is ongoing at Shore Rd,
upon completion; the Ridgewood Ave station is next on the list.
Utility Commission staff is performing the installation of equipment, conduits and wiring. A
scope of services change order was executed that directs the contractor to supply 18 cellular
amplifiers and associated equipment in lieu of providing broadband to 5 stations. Utility
Commission staff will be installing the amplifiers during the process of the controls upgrades.
This project is ongoing.
7. Contract #1 Sewer Easement Access Project
Capital Improvement Fund L.I. 33123-55019 $250,000.00
Current Available Balance $174,800.00
The request for a Special Appropriation of funds in the amount of $500,000 was approved by
the Board of Selectmen on 1/10/23. On 1/11/23 the Board of Finance acted to reduce the
original request appropriation to $250,000. On 2/6/23 the RTM approved the $250,000.00
Special appropriation. On August 8, 2023 the Utility Commission accepted Wright–Pierce
Engineers (W/P) task order proposal in the amount of $75,200.00. Survey of the C-1 easement
started October 2, 2023 and is now complete. Wright-Pierce (W/P) submitted the Preliminary
drawings on February 6, 2024. A plan review session with W/P is scheduled for February 14,
2024
8. Plastic Water Service Line Replacement Program
CNR Appropriation Li# 20531-57881 $550,000.00+ $181,300.00 = $731,300.00
An additional 100K was designated FY24 , a request to move from an appropriation to a
designation will take place when the currently appropriated funds are expended.
Current Available Balance: $512,086.58
P a g e | 4
Work commenced on this project on May 22, 2023. The City of New London contract service
provider, Veolia replaced 21 plastic services on Shore Road and Waterford Utility Commission
Maintenance Staff replaced 16 services on Shore Rd. Waterford crews also replaced 35 services
on Niantic River Road and 38 services within the Tiffany neighborhood and replaced 41 services
within the Birdville neighborhood. To date a total of 2,488 LF of service lines were replaced. A
request for an additional $181,300.00 to replace plastic water services on Old Norwich Rd was
approved by the Board of Selectman, Board of Finance and subsequently by the RTM on
August 7, 2023. The Maintenance division will start replacing services on Brill Ave, Old Norwich
Rd. in the spring.
Water Revenue Funded Projects
9. The Lead and Copper Rule $98,763.00 Wright-Pierce Engineers (W/P) L.I. # 21131-
55302
The Lead and Copper Rule (LCR), first promulgated in 1991, was enacted by the USEPA to
protect public health and reduce exposure to lead and copper in drinking water. In January
2021 the USEPA published the Lead and Copper Rule Revisions (LCRR). The LCRR aims to better
protect public and get the lead out of our nation’s drinking water. One major regulatory change
included in the LCRR is the requirement for water systems to develop a lead service line (LSL)
material inventory and an LSL replacement (LSLR) plan if lead or lead goosenecks are found by
October 16, 2024. The LSL inventory which is mandated by USEPA and the Connecticut
Department of Public Health (CTDPH) requires that Waterford creates an inventory of the
existing water service lines materials (plastic, copper, lead, galvanized, other) on public and
private side in Waterford’s water system and identify which service lines may be galvanized or
contain lead. W/P is currently working with staff obtaining data. Work on this project continues.
10. Bloomingdale Rd Low Pressure Evaluation $13,900.00 Wright-Pierce Engineers
L.I. # 21131-55303
This evaluation entails the engineering services to reevaluate options to enhance residential
and fire protection pressures on Bloomingdale Road, near the Gallows Lane tank. The
Connecticut Department of Public Health (CT DPH) regulations require water systems to
maintain a minimum pressure of 35 psi in their water distribution system and a minimum of 20
psi during a fire flow event. In 2004, the Waterford Utility Commission (WUC) received
complaints of low pressure from residents on Bloomingdale Road, near the Gallows Lane tank.
In a subsequent sanitary survey, CT DPH cited a violation for water pressures below 35 psi and
20 psi at services in this area. The proposed evaluation is to review recommendations from
previous study, update construction cost estimates, and evaluate new alternatives. Work on
this project continues.
P a g e | 5
Wastewater Enterprise Funded Projects
Operational and Other
• All wastewater collection system components and equipment are operational with
exception to :
1. The SCADA server #1 which is experiencing issues. We have requested our
consulting engineers to submit a task order for preparation of bid documents for a
new SCADA system.
2. The CCTV truck has a faulty engine, The Lead Fleet Mechanic is evaluating options
although are limited due to the year of the vehicle, 1991
• Caroline Ct land survey is complete and the monuments are set. A request has been
sent to the First Selectman to initiate the CGS 8-24 process. The issue was reviewed by
Town Departments and the Town Attorney. A meeting with the property owner is
scheduled for February 15,2024
• The GIS migration with Tighe & Bond is being coordinated by the Assistant Director
and remains a work in progress.
• The Asset Management software project proposal will move forward upon full
migration of the GIS system.
• The Compliance Enforcement Technician Job Description , which replaces the
Assistant Construction Inspector position, has been reviewed by the Director of
Human Resources and the Union. A meeting with the Personnel Review Board is
scheduled for February 15, 2024 for their review and tentative action.
• We have solicited a proposal for services necessary to update and revise our Water
and Wastewater Standards and Specifications the last update was 2006. A proposal
will be forthcoming.
Respectfully Submitted,
James A. Bartelli
Director of Utilities