tent checklist

document center

Pages2
File Size0.1 MB
FolderDepartments/Building/Forms & Reference Documents
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
TENTS (Temporary Structures)
PROJECT INFORMATION / CHECK LIST
Note to Applicant: This checklist is part of the application for permit and shall be
included with your submission along with all other required documentation.
Property Address:
Name of Applicant:
Is the applicant the owner? o Yes o No
Purpose for the tent:
The total estimated cost to erect the tent(s) including labor & material is:
$ ;
NOTE: If you are doing the work yourself, a fair market labor cost must be included for your time.
Is this tent. o Commercial o Residential
Is the tent in a flood zone? a Yes o No
What size is the tent? (square feet)
NOTE: if multiple tents are being proposed, include the square footage of each tent separately.
How many people will occupy the tent?
Will electricity be supplied to the tent? 0 Yes 0 No
Method of supplying electricity
Will lighting be supplied to the tent? a Yes a No
Method of supplying light
Will heat be supplied to the tent? o Yes co No
Source of Heat:
Will the tent have sides? o Yes o No
Will food be cooked in the tent? a Yes a No
How will the tent be anchored?

Date of Tent Install: Date of Tent Removal:
Hours of Use
The following information shall be provided with your application. All
documents should contain the property Owner’s name and the project address. :
a Building permit application is completed
o Two sets of all required documentation are provided*
a Cost estimate is provided
Property taxes are current
a
a Utility Commission sewer fees are current
c Plot plan showing the location of the proposed tent(s) and distances from the tent to
other structures, including other tents.
a Tent Vendor's Workers’ Compensation Insurance Certificate
o Certificates of Flame Resistant Treatment
* Please note that a permit is also required from the Waterford Fire Marshal's Office. A
copy of all documentation submitted with the Building Permit will be required by the
Fire Marshal.