WATERFORD TOWN CENTER DEVELOPMENT RECEIVED FOR RECORD
AD-HOC COMMITTEE WATERFORD. CT
SPECIAL MEETING MINUTES ai MAY -G 2 14
May 6, 2024 2004 HAY -8
Members Present: Chair Miriam Furey- Wagner, Nancy Sugrue, Crissy Wage dhs Ord Gouge
Members Absent: Melissa Chiappone, Traci Santos (notified), ,
Staff Present: Jonathan Mullen, AICP, Planning Director; Kim Powell, Recording Secretary
1. CALL TO ORDER
Chair Furey- Wagner called the meeting to order at 5:03 pm.
2. APPROVAL OF THE MEETING MINUTES April 24, 2024
MOTION: Motion made by Committee Member Waggoner seconded by Committee
Member Sugrue, to approve the April 24, 2024 meeting minutes.
VOTE: 3-0-0
3. UPDATE ON CIVIC TRIANGLE PROJECT
Mr. Mullen stated that the wetlands area at the southwest corner of the pond will be planted.
by a professional landscaper under the guidance of a professional wetlands soil scientist
(TBD). He then stated that walkways from the foot bridge at the southwestern corner of the
site and the boardwalk at the southeastern side of the side of the site have been installed. The
stone wall along Rope Ferry Road will be capped to provide seating. The playground area
will remain closed until the electrical service is updated. Eversource will be installing a new
pole and run power over Boston Post Road. Once complete, power will also be restored to
the pond fountains, recirculating pumps and aerators. Hydro-seeding at the pond needs to be
completed. The large pile of soil at the west side of the site will be used to regrade the
southeast corner. A permit application has been submitted and approved by the State of
Connecticut Department of Transportation (CTDOT) for the streetlights and trees along State
road Route 156. The town is waiting for the CTDOT to issue the permit. Mr. Mullen
expects the project to be finished on July 1“ and a ribbon cutting is planned for August 9",
4. GARBAGE AND RECYCLING BINS — Review additional options and select bins
Mr. Mullen and Ryan McNamara, Director of Recreation selected six additional
garbage/recycling bin options (see attached). The Committee studied the options, researched
specific details on-line and consulted with Mr. McNamara by phone at 5:40 pm. Mr.
McNamara said the size is to be a consideration but the town will be monitoring the bins
through the week and weekend to avoid overfilling. The goal of the Committee was to select
a bin that would meet the requirements set at the previous meeting. They should be:
standardized and esthetically attractive, look natural, be a reasonable cost, have side door
access, be covered on top, have adequate capacity and have clear labeling for trash and
recycling. Option 3 and 4 met the committee’s criteria. The Committee agreed Option 3 has
a more transitional style and compliments the benches already selected, has the largest
capacity, is less expensive than the original selection and are the most esthetically pleasing to
them.

AD-HOC COMMITTEE SPECIAL MEETING MINUTES May 6, 2024 Page 2
MOTION: Motion made by Committee Member Sugrue seconded by Committee Member
Waggoner to select the Adirondack Double Recycling & Waste Station (Option
#3).
VOTE: 3-0-0
5, ADJOURNMENT
MOTION: Motion made by Committee Member Waggoner seconded by Committee
Member Sugrue, to adjourn at 6:04 pm.
VOTE: 3-0-0
Respectfully Submitted,
Kim Powell, Recording Secretary

Attachment Page 1 of 2
ORIGINAL SPEC WAS FOR SEPARATE GARBAGE AND RECYCLING BINS
$2,470 EACH — Task was to find less expensive options that would fit in the park setting
Landscape Forms
Poe
Litter & Recycling
‘ 34 Gallon
Powder coated Aluminum
Side empty
Multipte Signage Options
$2,470 Litter
$2470 Recycling

OPTION #1
PROS
Classic look
Best price $848.99
OPTION #2
PROS
OPTION #3
PROS
Good size
Transitional style
Well-designed top
Good price $2,682
OPTION #4
PROS
Good size
Good price $2,457
OPTION #5
PROS
Good price $1,753
OPTION #6
PROS
Attachment Page 2 of 2
CONS Gp aD Dual 17 Ga. Cast
Not available in a 2 Aluminum
in large enough size ‘ Receptacle w/
Powder Coated
Finish, Basket
Weave
CONS [
Too large = Two stream
i | outdoor
Top looks flimsy mmorptaaile
More expensive $2,921 combo
CONS Adirondack
Double
Recycling &
waste
Station
CONS
Not aesthetically pleasing
Manchester
side load
CONS
Not aesthetically pleasing Manchester
side load
= slim double
recycling
container
Dorset
CONS side load
. : . double
Flat top (potential for items being left recycling
behind on top of bin) station
Not aesthetically pleasing
More expensive $2,968