Oswegatchie Fire Station Building Committee - Minutes - 04/01/2025

agenda center minutes

Board/CommissionOswegatchie Fire Station Building Committee
Meeting DateApril 01, 2025
Pages6
File Size0.2 MB
OCR Status Searchable (OCR processed)
Source URLOriginal
Download PDF

Document Preview

Full Text (OCR Extracted)
FIFTEEN ROPE
FERRY
ROAD.
WATERFORD, CT
06385-2886
April 1, 2025
Members Present: Robert Tuneski, Jennifer Bracciale, Rocco Bracciale, Wayne Gilpin, Ted
© Public Comment: None
© Opening Remarks: None
‘© Approval of invoices: None
T.
Olynciw
had
been
keeping
track
of
old
business
which
remained
as
open
items.
The
* Old Business: None
¢ Current Business:

a. Recording secretary provided text information from Director M. Howley regarding the
estimate. E. Cantar asked Benesch for clarification of what their estimates included due
water which SPA’s civil engineer stated that gets signed off within 60 days of
¢. Geotech report ~ The first 6” below grade there exists “uncontrolled fill” which means the
soil is not suitable to place a typical foundation support. This fill would need to be dug
out and presented. Water table ~ Measured at 26” above sea level and the site is at 35°
used.
weeks to work this out. A copy of the floor plan and comments from P. Rafuse and W.
Gilpin was given to W.B. Manson. J. Bracciale believes Lesro’s products are a higher
quality than W.B. Mason and prices are comparable. She will contact Lesro reps and pass
f B. Tuneski will ask the Purchasing Agent if the FF&E costs will be part of the bid
h. D. Stein reported they are on schedule for substantially completed construction
documents by the end of April. The bids would go out in the beginning of June. It will

present in the bonding letter.
Tuneski will confirm with David Campo, Town Clerk the lead time required to request a
i, Once a contractor is on board, they are responsible for filing a building permit. They will
The gear washer and dryer will be included as part of the hard bid cost. P. Rafuse
compressor P. Rafuse had asked for some recommendations. E. Cantar obtained cut
sheets for different options and models. D. Stein stated this would be worked out at the
k. §. Smith to contact Purchasing Agent regarding soft cost prices in order to populate the
1. Next meeting is scheduled for 4/15/25 at 6:30pm.
MOTION by R. Muckle, second by P. Rafuse to adjourn.

2
MA
ARCHITECTS
ENGINEERS
MEETING
MINUTES
INTERIORS
WATERFORD, CT 06385
ATTENDEES: Building Committee for Town of Waterford (_robert_tuneski@sbeglobal nel), SP + A (ecantar@siverpetruceli.com)
building willbe placed to see ifit would be safe to reuse from a hazmat perspective. There willbe fil that is.
needed on site as per the civil drawings.
RTM.
vor.
Architectural Update:
given the location ofthe building

matter
‘©
This
timeline
puts
the
schedule
on
track
to
break
ground
in
July,
‘Any
correction,
addition,
or
comments
should
be
made
to
Siver
Petruceli
+
associates
with
14
days
of
the
date
of
the
meeting
DISTRIBUTION:
SP+A
FILE
TO
THE
BUILDING
COMMITTEE
FOR
THE
TOWN
OF
WATERFORD

WDESK Insight 4 sivocoiegonses 25352oswegatnie Fir Station Mecnaica.
sie th port for nsighi customers wil oo longe be awl fom sigh Suppor aadenL
com. Customers afe redirected to request support through the regular Autodesk support channels. We are working with Autodesk Technical Support to mate the transition as seamless 3
ort an issue and request support please click learn more. When prompted for product please select Revit.
features available. Click on Learn More to see newly updated features.
Overview 2
Text
Pe and Interiors subset of architectural elements based onthe: ded
Waterford
ng stage (Al -A3) + Operational energy (86
© 23.52 _Osmegatchie Fire Station Mechankcal_R2% © To1al carbon
4 1,308,175.82 kgCO2e
tat 7%) om)
ANNUAL EU! - KBTU/SF:
HEATING = 1.361
COOLING = 36.355
LIGHTING = 12.228
EQUIPMENT = 15.896
©
Embodied
carbon
4 15,288.81 kgCO2€
© Area Building @ Building Lifespan
11,464.76 ft? acu
© Operational carbon © Annual Energy Use
1,292,887.01
kgCO2e
65.84
kBtu/ft?
ELECTRICITY 34,000 KWH ANNUAL, $3200/MONTH