Oswegatchie Fire Station Building Committee - Minutes - 04/01/2025
agenda center minutes
| Board/Commission | Oswegatchie Fire Station Building Committee |
|---|---|
| Meeting Date | April 01, 2025 |
| Pages | 6 |
| File Size | 0.2 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD. WATERFORD, CT 06385-2886 April 1, 2025 Members Present: Robert Tuneski, Jennifer Bracciale, Rocco Bracciale, Wayne Gilpin, Ted © Public Comment: None © Opening Remarks: None ‘© Approval of invoices: None T. Olynciw had been keeping track of old business which remained as open items. The * Old Business: None ¢ Current Business: a. Recording secretary provided text information from Director M. Howley regarding the estimate. E. Cantar asked Benesch for clarification of what their estimates included due water which SPA’s civil engineer stated that gets signed off within 60 days of ¢. Geotech report ~ The first 6” below grade there exists “uncontrolled fill” which means the soil is not suitable to place a typical foundation support. This fill would need to be dug out and presented. Water table ~ Measured at 26” above sea level and the site is at 35° used. weeks to work this out. A copy of the floor plan and comments from P. Rafuse and W. Gilpin was given to W.B. Manson. J. Bracciale believes Lesro’s products are a higher quality than W.B. Mason and prices are comparable. She will contact Lesro reps and pass f B. Tuneski will ask the Purchasing Agent if the FF&E costs will be part of the bid h. D. Stein reported they are on schedule for substantially completed construction documents by the end of April. The bids would go out in the beginning of June. It will present in the bonding letter. Tuneski will confirm with David Campo, Town Clerk the lead time required to request a i, Once a contractor is on board, they are responsible for filing a building permit. They will The gear washer and dryer will be included as part of the hard bid cost. P. Rafuse compressor P. Rafuse had asked for some recommendations. E. Cantar obtained cut sheets for different options and models. D. Stein stated this would be worked out at the k. §. Smith to contact Purchasing Agent regarding soft cost prices in order to populate the 1. Next meeting is scheduled for 4/15/25 at 6:30pm. MOTION by R. Muckle, second by P. Rafuse to adjourn. 2 MA ARCHITECTS ENGINEERS MEETING MINUTES INTERIORS WATERFORD, CT 06385 ATTENDEES: Building Committee for Town of Waterford (_robert_tuneski@sbeglobal nel), SP + A (ecantar@siverpetruceli.com) building willbe placed to see ifit would be safe to reuse from a hazmat perspective. There willbe fil that is. needed on site as per the civil drawings. RTM. vor. Architectural Update: given the location ofthe building matter ‘© This timeline puts the schedule on track to break ground in July, ‘Any correction, addition, or comments should be made to Siver Petruceli + associates with 14 days of the date of the meeting DISTRIBUTION: SP+A FILE TO THE BUILDING COMMITTEE FOR THE TOWN OF WATERFORD WDESK Insight 4 sivocoiegonses 25352oswegatnie Fir Station Mecnaica. sie th port for nsighi customers wil oo longe be awl fom sigh Suppor aadenL com. Customers afe redirected to request support through the regular Autodesk support channels. We are working with Autodesk Technical Support to mate the transition as seamless 3 ort an issue and request support please click learn more. When prompted for product please select Revit. features available. Click on Learn More to see newly updated features. Overview 2 Text Pe and Interiors subset of architectural elements based onthe: ded Waterford ng stage (Al -A3) + Operational energy (86 © 23.52 _Osmegatchie Fire Station Mechankcal_R2% © To1al carbon 4 1,308,175.82 kgCO2e tat 7%) om) ANNUAL EU! - KBTU/SF: HEATING = 1.361 COOLING = 36.355 LIGHTING = 12.228 EQUIPMENT = 15.896 © Embodied carbon 4 15,288.81 kgCO2€ © Area Building @ Building Lifespan 11,464.76 ft? acu © Operational carbon © Annual Energy Use 1,292,887.01 kgCO2e 65.84 kBtu/ft? ELECTRICITY 34,000 KWH ANNUAL, $3200/MONTH