Oswegatchie Fire Station Building Committee
agenda center agenda
| Board/Commission | Oswegatchie Fire Station Building Committee |
|---|---|
| Meeting Date | March 18, 2025 |
| Pages | 7 |
| File Size | 0.1 MB |
| OCR Status | Searchable (OCR processed) |
| Source URL | Original |
Document Preview
Full Text (OCR Extracted)
FIFTEEN ROPE FERRY ROAD WATERFORD, CT 06385-2886 AGENDA OSWEGATCHIE FIRE STATION BUILDING COMMITTEE March 18, 2025 Oswegatchie Fire Station 2" Floor Meeting Room 6:30PM 1. Callto order 2. Pledge of Allegiance 3. Public comment 4, Opening remarks 5. Review and Approve March 4th Meeting Minutes 6. Invoice Payments a. Approve Silver Petrucelli & Associates invoice 7. Old Business 8 Current Business a. Traffic Light Update b. Design Development Update c. Schedule 9. New Business 10. Confirm Next Meeting Date and Objectives 11. Adjournment FIFTEEN ROPE FERRY ROAD. WATERFORD, CT 06385-2886 Oswegatchie Fire Station Building Committee Meeting March 4, 2025, Meeting called to order at 6:32pm Pledge of Allegiance Members Present: Robert Tuneski, Jennifer Bracciale Rocco Bracciale, Wayne Gilpin, Ted Olynciw, Richard Muckle, Paul Rafuse, Guy Russo Members Absent: Matthew Blankenship Guests: Michael Howley, Mike Smith, Eric Cantar, Dave Stein, Shea Davy, Atty Nick Kepple Member of the public: Chris Hayley © Public Comment: None * Opening Remarks: None + Approval of meeting minutes: MOTION by T. Olynciw to table the approval of the 2/4/2025 minutes. No second. MOTION FAILS MOTION by W. Gilpin, second by J. Bracciale to accept the 2/4/2025 meeting minutes. FOR: B. Tuneski, J. Bracciale, R. Bracciale, W. Gilpin, R. Muckle, P. Rafuse, G. Russo AGAINST: T. Olynciw © Approval of invoices: MOTION by G. Russo, second by J. Bracciale to add an agenda item under invoices of Action Air invoice. FOR: Unanimous MOTION by G. Russo, second by J. Bracciale to pay the McNamara invoice for $2,500.00 as an act of good faith. DISCUSSION: T. Olynciw distributed a document with his thoughts disputing the payment of this invoice. (Attachment 1) Discussion ensued which included Atty. Kepple's opinion stating it does fall within the purview of the committee. T. Olynciw feels this payment should have the First Selectman’s approval before being paid. FOR: B. Tuneski, R. Muckle, J. Bracciale, R. Bracciale, G. Russo, W. Gilpin, AGAINST: T. Olynciw, P. Rafuse MOTION by G. Russo, second by W. Gilpin to pay the Action Air invoice for $355.03.00 based on the explanation of the Director. FOR: Unanimous Old Business: T. Olynciw provided an email with questions: (Attachment 2) 1 — Soil borings are scheduled for 3/7/25. 2~ Pre-demo survey ~ Skip item — Being addressed under Current Business 3 — Downes estimates a cost of $184,000.00 for the radiant floors in the bay. 4 —Cost of third bay ~ skip item — On agenda under Current Business. 5 ~ Per D. Stein the cost of the traffic light is not ready to present. He will provide an order of magnitude estimate from two traffic engineering companies. May also have an estimate provided by Director Howley from a firm he is familiar with. D. Stein and S. Smith will create a punch list of soft cost items for the committee to discuss. D. Stein asked for a sub-committee of end users to go through items with SPA and Downes. Requested a running list by the next meeting. Concer over the cost of IT equipment was brought up. The Purchasing Agent will provide names of IT vendors the committee can reach out to for price comparisons. a 1 D. Stein asked about the merging of the two parcels of land. Atty. Kepple will speak with Planning Director Jonathan Mullen. Current Business: a. Third Bay Cost Update: S. Smith reported the cost of the third bay is $410,000.00 now. If it was installed 10 years from now, the cost would be $1.8 million. b. Hazmat REP Update: S. Davy reported the vendor, SLR, indicated they would be taking 160-180 samples, not to exceed $6,000.00. The vendor, Mystic Air Quality, indicated they would be taking 120 samples, not to exceed $4,950.00 S. Smith asked if the vendor is providing a testing, sampling and hazmat plan and is it included in the not to exceed $4,000-6,000. S. Davy confirmed this ask. MOTION by R. Bracciale, second by P. Rafuse to give the authority to S. Smith to choose a hazmat company after comparison not to exceed $6,000.00. FOR: Unanimous MOTION by G. Russo to add an item to the agenda to confirm the three bay option of the Oswegatchie building. Second by W. Gilpin. FOR: Unanimous MOTION by G. Russo, second by R. Bracciale that the committee votes to reaffirm its decision that the new Oswegatchie fire house building is to be constructed having three bays as reflected in the building program & design development drawing submitted and approved to date. FOR: B. Tuneski, G. Russo, W. Gilpin, J. Bracciale, R. Bracciale, R. Muckle ABSTAIN: P. Rafuse, T. Olynciw Design Development Update: SPA is on the Planning & Zoning agenda for 3/11/25 at 6:30pm. D. Stein would like a representative from the committee to attend. D. Stein asked for a sub-committee with end users to be assembled to attend 2-3 Zoom meetings. The committee will consist of R. Bracciale, W. Gilpin, Director Howley and, in his absence, the committee volunteered P. Rafuse. Emails will be provided to E. Cantar, Confirmation of a gear washer/dryer and air compressor can be reviewed with the sub- committee. General sizing and if there is a specific brand. R. Bracciale asked D. Stein if he could provide a list of the FF&E incorporated at the Bristol job. A report on the soil conditions after the borings should take 2-3 weeks to receive, . The project is running on schedule, E, Cantar indicated they are on track to finish the documents by the end of April. B. Tuneski would prefer to have bids in in order to provide a cost to present at RTM’s June meeting to aid in the bonding paperwork. The traffic portion of the project is not able to be on the same pace as the design of the building. This may be a caveat for the bonding as we would only have an order of magnitude estimate to offer. D. Stein suggested take that number and have a 10% contingency. © New Business: T. Olynciw asked when going for the bonding are we going based on a budget or based on a bid. B. Tuneski’s response is we would want to use the most accurate information we have. S. Smith offered hard numbers are best. G. Russo asked how a contingency should be built in to handle any change orders that occur. A contingency should be part of the bonding allocation. B, Tuneski asked if there a typical percentage used. D. Stein stated if it is based on hard bid prices the contingency number could be predicted on that. 10% is a rule of thumb that is held in contingency. Atty. Kepple explained that the $800,000.00 the Town has expended between Downes and SPA is part of the overall cost of the project. If this is a $10,000,000.00-$12,000,000.00 project some of that amount has already been spent. © The next meeting is scheduled for 3/18/25 at 6:30pm. MOTION by R. Muckle, second by J. Bracciale to adjourn. FOR: Unanimous Meeting adjourned at 8:00pm Respectfully submitted by: Linda Finnegan, Recording Secretary vA SILVER PETRUCELLI + ASSOCIATES 3190 WHITNEY AVENUE HAMDEN CT 06518 311 STATE STREET NEW LONDON CT 06320 203 230 9007 silverpetrucelli.com ‘Town of Waterford Invoice number 25-1732 Linda Finnegan Date 03/01/2025, 15 Rope Ferry Road Waterford, CT 06385-2886 Project 23.352 Waterford - Oswogatchie Fire Station Professional services through February 28, 2025. Contract _ Percent Total Prior Current Description ‘Amount __ Complete Billed Billed Billed ‘Schematic Design Phase 66,200.00 100.00 66,200.00 66,200.00 0.00 Design Development 110,344.00 95.00 104,826.80 104,826.80 0.00 Construction Document Phase 286,000.00 0.00 0.00 0.00 0.00 Bid Phase 22,000.00 0.00 0.00 0.00 0.00 Construction Administration 132,000.00 0.00 0.00 0.00 0.00 Allowances - Traffic Engineering 42,500.00 0.00 0.00 0.00 0.00 Allowances - Geotechnical Borings 35,000.00 1744 6,000.00 0.00 6,000.00 Allowances - Hazardous Material Testing 25,000.00 0.00 0.00 0.00 0.00 Allowances - Boundary Survey & Wetland 15,000.00 100.00 18,000.00 15,000.00 0.00 Delineation Allowances - High Performance Buildings 25,000.00 0.00 0.00 0.00 0.00 Total 759,044.00 25.30 192,026.80 ___ 186,026.80 6,000.00 Invoice subtotal Fire Protection Design/Consutting tavoice total Town of Waterford Invoice nomber 25-1732 ‘voice date 03/01/2025 Page 1 of2 Town of Waterford Invoice number 25-1732 Project 23.352 Waterford - Oswogatchie Fire Station Date 0301/2025 Invoice Summary Contract Total Prior Current Description Amount Billed Billed Billed ‘Schematic Design Phase 66,200.00 66,200.00 66,200.00 0.00 Design Development 110,344.00 104,826.80 104,826.80 0.00 Construction Document Phase 286,000.00 0.00 0.00 0.00 Bid Phase 22,000.00 0.00 0.00 0.00 Construction Administration 192,000.00 0.00 0.00 0.00 Allowances - Traffic Engineering 42,500.00 0.00 0.00 0.00 Allowances - Geotechnical Borings 35,000.00 6,000.00 0.00 6,000.00 Allowances - Hazardous Material Testing 28,000.00 0.00 0.00 0.00 Allowances - Boundary Survey & Wetland Delineation 15,000.00 15,000.00 15,000.00 0.00 Allowances - High Performance Buildings 25,000.00 0.00 0.00 0.00 Fire Protection Design 0.00 400.00 0.00 400.00 Total 759,044.00 192,426.80 __ 186,026.80 6,400.00 Aging Summary Invoice Number Invoice Date__Outstanding Current Over 30 Over 60 Over 90_ Over 120 25-1600 (02/09/2025 60,689.20 60,689.20 25-1732 03/01/2025 6,400.00___ 6,400.00 Total 67,089.20 6,400.00 60,689.20 0.00 0.00 0.00 Approved by: David J. Stein Project Manager Town of Waterford lvoe number 25-1732 Tawoice date 030172025 Page 20t2